Pacific Motorway bikeway extension – Veloway stage 1 (Mcilwain Civil Engineering) Morrison Geotechnic conducted the initial geotechnical investigation and advice over the 900m alignment and followed up with detailed construction support including temporary stability assessment, bored pier verification and retention advice.